That's the whole separation the city's draft data-center ordinance puts
between a data center and your property line. I measured what that
actually allows. It is not enough, and the fix is specific:
500 feet, measured to the building.
—parcels could host a data center today under the draft's 200 ft rule
—parcels qualify once lawful lot splits are counted, because the draft's rule moves when lot lines are redrawn
—homes would sit within 1,000 ft of a possible data center site
These are zone-compatible parcels: the sites where the geometry
allows a data center under the draft ordinance. Every site still requires
a Board of Zoning Appeals special exception, plus noise, vibration,
environmental, and utility-capacity review before anything is built.
The map
Where the draft would let one go
Pick a methodology, drag the setback, and see what qualifies. Every
layer is computed from the city's own GIS data by
published scripts.
Setback200 ft
Layers
I-2 zoning Buildable patch Building envelope Strict-eligible parcel Eligible parcel (building-based) City-counted parcel City-counted, but no building fits Your address
Your address
How close could a data center be to your home?
The city's numbers
The city counted 27 eligible parcels. Twelve of them can't actually host one.
The city published parcel counts without naming the parcels. Its totals
are a fingerprint, though, and working backward from the city's own
arithmetic this site identified all 27. Under the ordinance's own
50 ft yard setbacks, 9 of them
cannot hold a building of any size. Three more have no spot 200 ft
from the homes the city's measurement skipped. One is an active rail
corridor. The single parcel the city reported at 500 ft could hold
a building of about 26 by 26 feet.
27 parcels identified12 fail the draft's own test9 can't hold any building12 survive the recommended rule
Amend the rule: 500 feet, measured to the building.
I am asking the Commission to change two things in §6.20.3.2.I. Measure
the separation to the data-center building instead of a
movable property line, and set the distance at 500 ft.
That change protects thousands of homes and still leaves
— viable industrial sites, each with
its buildable envelope published in advance.
The eligible set is fixed.
— parcels, publishable before a
single application is filed. Redrawing lot lines can't add or remove
one, because the test runs to the building's location, not to a
boundary a developer can move.
The 500 feet is real.
Measured to the building itself and verifiable at permit review.
The draft's 200 ft property-line rule only guarantees
250 ft between a data-center building and the nearest home's
property line.
No subdivision loophole.
Under the draft as written, a developer can qualify a
non-compliant parcel by drawing a new lot line at the setback
contour. Under the amended rule that maneuver changes nothing.
It holds up legally.
With — sites remaining, nobody
can claim the ordinance bans data centers outright. A bare 500 ft
property-line rule would leave — sites on
existing lots and invite exactly that challenge.
Draft: 200 ft to the property line
500 ft to the property line
500 ft to the building (proposed)
Eligible parcels, existing lots
–
–
–
Eligible parcels, with lot splits
–
–
–
Lot splits change the count
Yes
Yes
No
Guaranteed distance, building to nearest residential line
250 ft
550 ft
500 ft
What it means for homes
Under the draft as written, — homes
would sit within 500 ft of a possible data-center site and
— within 1,000 ft. Under the
amended rule, no home is within 500 ft of a lawful data-center
building. That is what the rule enforces, by construction.
Homes within…
…of a possible site under the draft (200 ft)
…if raised to 500 ft
…if raised to 1,000 ft
Home exposure computed under the draft's property-line measurement at
each setback. The 500 ft and 1,000 ft columns show how many
homes would remain within each distance of any possible site if the
city raised the number but kept the property-line rule. Lower is
better. For context, – parcels
would remain eligible under that rule at 200 ft,
– at 500 ft, and
– at 1,000 ft; the zeros
in the last column reflect that no sites remain at all. The
recommended building-based rule avoids that trade: it keeps
– sites at 500 ft by
measuring to the building itself.